ANALYSIS OF THE INSTALLATION METHOD OF HALF SLAB PRECAST ON KARANG SINGA BEACON TOWER BUILDING
Abstract
ABSTRACT
Innovation in construction methods is increasingly needed, especially in projects in extreme geographical conditions. This study analyzes the effectiveness of the precast half slab installation method in the Liang Liang Coral Beacon Tower Construction project in the Riau Islands, which is located ±4 nautical miles from Bintan Island, so that it does not allow the application of conventional casting. The half slab precast method was chosen to overcome the limitations of the working area, weather risks, and the need to accelerate construction time. The analysis was carried out through the stages of half slab design planning, fabrication, material distribution using a service barge, to the erection process using a crawler crane. The technical data of the half slab includes the configuration of HS1, HS2, and HS3 with a thickness of 200 mm and a concrete topping of 150 mm. The results of the analysis showed that the precast half slab met the technical requirements based on SNI 2847:2013 and the PCI Design Handbook, both in terms of lifting load capacity, bending moment control, and deformation during installation. The installation method has also proven to be efficient in terms of time and cost because it minimizes the use of formwork, reduces the risk of wet work at sea, and accelerates the implementation of erections. This study concludes that the half slab precast method is an effective and efficient solution for floor structure work in offshore projects, especially in locations with limited access and challenging environmental conditions.
Downloads
References
Badan Standardisasi Nasional Indonesia. (2012). Tata Cara Perencanaan Beton Pracetak Dan Beton Prategang Untuk Bangunan Gedung. Jakarta: BSN. Badan Standardisasi Nasional Indonesia. (2013). Beban minimum untuk perancangan bangunan. Jakarta: BSN.
Badan Standardisasi Nasional Indonesia. (2013). Persyaratan beton struktural untuk bangunan. Jakarta : BSN.
Cahyono, H., Carina, A., Putri Izza Rohmah, K., Yudha Kurniawan, E., Ehonía Timu, M., Azmi, A. U., & Waluyo, muhammad. (2025). KINERJA STRUKTURAL DAN KEBERLANJUTAN BANGUNAN PABRIK SIGARET DI BAWAH BEBAN DINAMIS : ANALISIS BERBASIS ETABS PADA SISTEM RANGKA BAJA. DEARSIP : Journal of Architecture and Civil, 5(01), 14-26. https://doi.org/https://doi.org/10.52166/dearsip.v5i01.7802
Cahyono, H., Mulyono, J., Carina, A., Hendy Wicaksono, M., & Hendrik Waluyo, muhammad. (2024). UPPER–STRUCTURE ANALYSIS OF BTS TOWER ON HIGH WIND SPEED AREA. DEARSIP : Journal of Architecture and Civil, 4(02), 119-133. https://doi.org/https://doi.org/10.52166/dearsip.v4i02.7800
Dwiatmoko, A., Putra, Y., & Khairul, A. (2021). Studi efisiensi penggunaan panel precast pada struktur gedung. Jurnal Infrastruktur, 7(1), 35–42.
Ervianto, W. I. (n.d.). Studi Implementasi Teknologi Beton Pracetak.
Fathurohman, R., & Firmanto, A. (2020). Evaluasi kinerja pelat beton pracetak pada proyek bangunan tinggi. Jurnal Konstruksi, 12(1), 45–52.
Firdaus, H., Sari, M., & Maulana, H. (2017). Implementasi plat precast dalam konstruksi gedung bertingkat. Jurnal Rekayasa Struktur, 14(3), 221–230.
Nugroho, A. (2016). Analisis sambungan sistem half slab precast pada struktur pelat dua arah. Jurnal Teknik Sipil, 8(2), 77–85.
PCI (Precast/Prestressed Concrete Institute). (2010). PCI Design Handbook: Precast and Prestressed Concrete (7th ed.). USA: PCI.
PCI Design Handbook Precast and Presstressed Concrete 7th. (2010). USA.
Prasetyo, D. (2020). Evaluasi penggunaan crane barge untuk pemasangan elemen precast di wilayah pesisir. Jurnal Teknik Kelautan, 23(2), 67–75.
PRASETYO, D., Firmansyah H., A., & shohib, M. (2024). THE METHOD OF IMPLEMENTING COLUMN WORK IN THE AL MUKHLISIN MOSQUE CONSTRUCTION PROJECT, BABAT VILLAGE. DEARSIP : Journal of Architecture and Civil, 4(02), 37-43. https://doi.org/https://doi.org/10.52166/dearsip.v4i02.7855
Putra, H., & Santoso, P. (2019). Tantangan proyek konstruksi di lokasi kepulauan dan solusi transportasi material. Jurnal Infrastruktur Maritim, 3(2), 88–96.
Setiawan, A., Shodiq, M., & Mayasari, I. (2024). METODE PELAKSANAAN PEKERJAAN KONTRUKSI KOLOM DALAM PROYEK PEMBANGUNAN MASJID-BKMS JIIPE GRESIK. DEARSIP : Journal of Architecture and Civil, 4(02), 58-71. https://doi.org/https://doi.org/10.52166/dearsip.v4i02.7857
Suryanto, A. (2018). Inovasi metode pelaksanaan struktur pada proyek konstruksi modern. Jurnal Teknik Sipil Indonesia, 10(1), 1–10.
Wibowo, A. (2020). Analisis produktivitas pekerjaan struktur precast pada proyek bangunan tinggi. Jurnal Teknik Sipil, 16(2), 145–154.