ANALISIS PENERAPAN MANAJEMEN WAKTU DENGAN METODE CPM PADA PROYEK PEMBANGUNAN PERUMAHAN DEWI KENCANA BLOK A KOTA MALANG

  • Agus Setiawan Fakultas Teknik Unisda Lamongan
  • Muhammad Koderi W.H. Program Studi Teknik Sipil, Universitas Islam Darul 'Ulum Lamongan
  • Zidan Rizky M Fakultas Teknik Unisda Lamongan
  • Vanezia Yuniar Caroline Fakultas Teknik Unisda Lamongan
Keywords: CPM, Optimal Time, Project Management

Abstract

The success of a project depends on the efficiency of its implementation, with clear objectives, a well-structured plan, and proper implementation. A good project estimation project will provide an estimate of time and cost; if you work on a project for a long period of time, the cost of completion will increase. A good one takes into account time and cost. If you work on a project for a long period of time, the cost of completion will increase. Project management is one of the factors that contributes to the success of a project in achieving its goals within a specified time period. Management is one of the factors that determines the success of a project in achieving its goals according to the specified time period. This study focuses on time management in the Dewi Kencana project in Block A, No: 29, Malang City. The Critical Path Method (CPM) is used for time management and to understand the critical path of a project. The data collection method is carried out by field studies using the interview method with the project head which contains data for further research. The results obtained from the study with the completion of forward calculations, backward calculations, free float and total float. The results of the project completion duration obtained were 23 weeks, 16 weeks faster than the project completion plan of 39 weeks.

Downloads

Download data is not yet available.

References

D. H. Mewengkang, F. P. Y. Sumanti, and G. Y. Malingkas, “Analisis Penjadwalan Proyek
Menggunakan Metode PDM Dengan Menggunakan Konsep Cadangan Waktu Pada Proyek Pembangunan Rumah Susun Kejaksaan Tinggi Sulawesi Utara,” Tekno, vol. 21, no. 83, pp. 270–280, 2023.
A. (Universitas K. P. Desi, “Proyek Pada Suatu Kontraktor Bumn,” vol. 3, no. 2, pp. 1–8, 2016.
A. Ratih and D. Purnama Sari, “Percepatan Waktu Penyelesaian pada Proyek Peningkatan Jalan, Upaya Menggunakan Metode CPM dan Pert,” J. Civ. Eng. Student, vol. 4, no. 1, pp. 85– 91, 2022.
S. Kiswati and U. Chasanah, “Perencanaan Manajemen Proyek Dalam Meningkatkan Efektifitas Kinerja Sumber Daya Manusia Di Semarang Jawa Tengah,” Neo Tek., vol. 6, no. 1, p. 2, 2020.
A. O. M. R. R. L. Ingkiriwang and M. Sibi, “Optimasi Waktu Proyek Dengan Penambahan Jam Kerja Menggunakan Precedence Diagram Method Pada Proyek Rehabilitasi Puskesmas Minanga,” J. Sipil Statik, vol. 7, no. 9, pp. 1203–1210, 2019.
R. Wospoga, Rafi’e, and N. Wardhani, “Analisa Pembiayaan Proyek Pembangunan
Lanjutan Gedung Laboratorium Terpadu FKIP Universitas Tanjungpura Pontianak,” JeLAST J. PWK, Laut, Sipil, Tambang, vol. 2, no. 2, pp. 1–7, 2015.
S. Batlajery, “Penerapan Fungsi-Fungsi Manajemen Pada Aparatur Pemerintahan Kampung Tambat Kabupaten Merauke,” J. Ilmu Ekon. Sos., vol. 7, no. 2, pp. 135– 155, 2016, doi: 10.35724/jies.v7i2.507.
A. A. Karaini, “Pengantar Manajemen Proyek,” p. 70, 2010.
S. E. Bawono, “Identifikasi Kegagalan Pelaksanaan Crash Program Dalam Proyek Kontruksi,” INERSIA lnformasi dan Ekspose Has. Ris. Tek. Sipil dan Arsit., vol. 13, no. 1, 2017, doi: 10.21831/inersia.v13i1.14598.
B. Suhartono, B. Budi, A. Siahaan, I. Nasution, and M. Syukri, “Analisis Metode dan Pendekatan dalam Manajemen Proyek pada Dunia Pendidikan,” Edumaspul J. Pendidik., vol. 6, no. 1, pp. 25–31, 2022, doi: 10.33487/edumaspul.v6i1.2809.
G. P. Arianie and N. B. Puspitasari, “PERENCANAAN MANAJEMEN PROYEK
DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER
DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd),” J@ti Undip J. Tek. Ind., vol. 12, no. 3, p. 189, 2017, doi: 10.14710/jati.12.3.189-196.
Nika Sintesa, “Analisis Pengaruh Time Management Terhadap Kedisiplinan dan Akademik Mahasiswa,” Trending J. Manaj. dan Ekon., vol. 1, no. 1, pp. 36–46, 2022, doi:
10.30640/trending.v1i1.465.
L. Muliati and A. Budi, “Pengaruh Manajemen Waktu, Keselamatan Kerja, Dan,” Dyn. Manag. J. , vol. 5, no. 1, pp. 38–52, 2021.
A. P. Harlina, M. Theresia, and S. Hartati, “Mengembangkan Kemampuan Manajemen Waktu Melalui Layanan Penguasaan Konten dengan Teknik Kontrak Perilaku,”
Indones. J. Guid. Couns. Theory Appl., vol. 3, no. 1, pp. 1–8, 2018.
A. A. Gea, “Time Management: Menggunakan Waktu Secara Efektif dan Efisien,” Humaniora, vol. 5, no. 2, p. 777, 2014, doi: 10.21512/humaniora.v5i2.3133.
Suparno, “Perencanaan dan penjadwalan proyek pada pembangunan gedung,” Politek. Negeri Semarang, vol. 1, no. 024, pp. 56–67, 2015.
I. A. P. S. Mahapatni, Metode Perencanaan dan Pengendalian Proyek Konstruksi. 2019.
S. A. Purba, “Analisis Jaringan Kerja dengan Metode Critical Path Method (CPM) dan Model Program Linier,” J. Absis J. Pendidik. Mat. dan Mat., vol. 4, no. 1, pp. 429– 438, 2021, doi: 10.30606/absis.v4i1.993.
W. Yuwono, M. E. Kaukab, and Y. Mahfud, “Kajian Metode PERT-CPM dan Pemanfaatannya dalam Manajemen Waktu dan Biaya Pelaksanaan Proyek,” J. Econ. Manag. Account. Technol., vol. 4, no. 2, pp. 192–214, 2021, doi:
10.32500/jematech.v4i2.1925.
G. T. Mardiani, “Analisis Estimasi Waktu Penyelesaian Proyek Perangkat Lunak Menggunakan Metode PERT,” is Best Account. Inf. Syst. Inf. Technol. Bus. Enterp. this is link OJS us, vol. 3, no. 2, pp. 336–343, 2018, doi:
10.34010/aisthebest.v3i2.1523.
Setiawan, A., & Mayasari, I. (2021). Analisis Percepatan Waktu Dan Biaya Proyek
Peningkatan Jalan Menggunakan Metode Time Cost Trade Off dengan Penambahan Jam Kerja dan Jumlah Alat (Studi Kasus: Jalan Betoyo-Dagang
Kecamatan Manyar Kabupaten Gresik). DEARSIP: Journal of Architecture and Civil, 1(1), 57-70.
Robi’in, M., & Setiawan, A. (2021). Pengendalian Waktu Dan Biaya Pada Proyek Peningkatan Jalan Menggunakan Metode Earned Value (Studi Kasus: Jalan
Betoyo-Dagang Kecamatan Manyar Kabupaten Gresik). DEARSIP : Journal of
Architecture and Civil, 1(1), 45-56.
https://doi.org/https://doi.org/10.52166/dearsip.v1i1.2526
Umam, M., Abidin, Z., & Wijaya, A. (2022). Pengendalian Biaya Dan Waktu Pada Proyek
Pembangunan Hibah Perluasan Gedung Sabhara Polres Lamongan. DEARSIP :
Journal of Architecture and Civil, 2(2), 93-114.
https://doi.org/https://doi.org/10.52166/dearsip.v2i2.3533
Khoirunnizam, M., & Setiawan, A. (2022). Kajian Penyebab Keterlambatan Pelaksanaan
Proyek Rehabilitasi Jembatan Beton Penghubung Nglinggo —
Kepohbaru. DEARSIP : Journal of Architecture and Civil, 2(2), 125-143.
https://doi.org/https://doi.org/10.52166/dearsip.v2i2.3536
Published
2025-10-10
How to Cite
Setiawan, A., Koderi W.H., M., Rizky M, Z., & Yuniar Caroline, V. (2025). ANALISIS PENERAPAN MANAJEMEN WAKTU DENGAN METODE CPM PADA PROYEK PEMBANGUNAN PERUMAHAN DEWI KENCANA BLOK A KOTA MALANG. SAINTIS Jurnal Ilmu-Ilmu Eksakta, 3(1). https://doi.org/https://doi.org/10.52166/saintis.v3i1.11131