[1]
Asa, M. and Julian, M. 2024. COMPARISON OF COST BUDGET ANALYSIS BETWEEN THE 2016 AHSP METHOD, AHSP 2022 METHOD AND THE CONTRACTOR’S CALCULATION METHOD ON THE WARUNG JATI RESTAURANT PROJECT, BEKASI CITY. DEARSIP : Journal of Architecture and Civil. 4, 02 (Nov. 2024), 134-147. DOI:https://doi.org/https://doi.org/10.52166/dearsip.v4i02.8028.