Lasmito, Lasmito. 2021. “Analisa Peneprapan Manajemen Waktu Pada Proyek Pembangunan Gedung Kantor Dan Pendopo Kecamatan Sarirejo”. DEARSIP : Journal of Architecture and Civil 1 (1), 41-44. https://doi.org/https://doi.org/10.52166/dearsip.v1i1.2527.