Wasito, W., and A. Syaikhudin. “STUDI PENERAPAN CRITICAL PATH METODE (CPM) PADA PROYEK PEMBANGUNAN PABRIK SEMEN REMBANG PT SEMEN GRESIK”. J-MACC : Journal of Management and Accounting, Vol. 3, no. 2, Oct. 2020, pp. 74-91, doi:https://doi.org/10.52166/j-macc.v3i2.2072.